Phoenix Tower International
Monday, September 28, 2020

Carriers Map Day 2020

Geographic diversity and backhaul, two strongholds of EllaLink project

The 6,000-kilometer laying between Portugal and Brazil, which will start operations between April and May 2021, has geographical diversity as unique differential, said Philippe Dumont, CEO of EllaLink, in his presentation at the Carriers Map Day. “Having a good backhaul is as important as the submarine cable. Our backhaul in Europe provides great improvements in the Iberian Peninsula. Our differential is not in services but in the way we want to connect Europe and Latin America”, he highlighted.

The EllaLink is 75% built. Dumont acknowledged that they are aware that it will not handle the same traffic as those on the Brazil-United States route. For the design and formulation of the project, they made a balance between capacity and costs, whereby the number of fiber pairs was the main decision they had to make. “We decided to have four fiber pairs. Most of the cables are larger. The EllaLink will be smaller”, he admitted.

As part of the focus on backhaul, a landing station is being built in Sines, Portugal. It not only aims to serve the EllaLink, but it will be a new station for other submarine cables. Faced with the trend in the industry to reuse existing sites (Praia Grande and Santos, for example, in Brazil), in this case it is a totally new facility. In addition to the landing station, it will have backhaul to connect Sines with Lisbon and Madrid, and from there the land laying continues to Marseille, the arrival point for many cables to Asia.

Last news and analysis

Perú · Internet & OTT · Software and Applications

29/10/2020

Growth of digital wallets would reach double digits in the post-pandemic

Argentina · Satellites

29/10/2020

VENG prepares VLE for 2024, the first milestone on a promising path for local industry launchers

The firm is the executing arm of the CONAE (Argentine National Commission for Space Activities). The design and manufacture is divided into three parts: flight segment, ground, and operations services. Each stage has a life cycle, which begins with the study of concepts, followed by assembly, integration and testing. Meanwhile, a private venture, run by LIA Aerospace, is advancing to launch low-orbit satellites.

Argentina · Internet & OTT

27/10/2020

Born to be global

The video game industry exported US$ 57.6 million in 2019 and continues growing. Every 5 years a new company appears that goes out into the world. The latest success story is that of Etermax with Trivia Crack. After acquiring Performash, Máximo Cavezzani's firm plans to double its AdTEch area this year.

Perú · Spectrum

22/10/2020

Peru wants to structure a 3.5 GHz and 26 GHz “combo” for a bidding process in 2021

In the public consultation that proposed using the 3.5 GHz spectrum for new services, six comments were received (including four from mobile operators Claro, Movistar, Bitel and Entel).

Search news